2-35. MAINTENANCE OF POWERPLANT.
This task covers:
a.
Removal
b.
Inspection/Repair
c. Installation
INITIAL SETUP
Tools and Special Tools
Equipment Conditions
Automotive maintenance and repair shop
Prepare a safe, solid stand of heavy
equipment: organizational maintenance,
wooden blocks or a suitable metal stand
common no. 2 (less power) (item 81,
on which to set the powerplant after
appx B)
removal. Place the stand on a level 8 x
Breaking bar (3/4 in. sq dr)
10-ft (2
x
3-m) area near the vehicle.
Socket (1-1/2 in.)
Ensure there is enough head and side
Torque wrench (0 to 600 ft-lb)
room around the vehicle to work the
Wrecking bar
hoisting equipment. The hoisting
5-ton hoist
equipment must have at least a 5.0-ton
Powerplant lifting sling (item 26, appx G)
(4.5-metric ton) rating, a 9.0-ft (2.7-m)
Plier wire twister (item 30, appx G)
reach, and a 10.0-ft (3.0-m) lift.
Materials/Parts
General Safety Instructions
Cotter pin (2)
Dry cleaning solvent (item 16, appx C)
Gasket (3)
Lockwasher(12)
Vehicle has no brakes when
Lockwasher
powerplant is disconnected. Failure
Lockwasher (3)
to securely block front and rear vehi-
Lockwasher (18)
cle tracks could cause injury to
Lockwasher (4)
personnel or damage to vehicle or
Lockwire (item 23, appx C)
other equipment if vehicle is free to
Lockwire (item 26, appx C)
roll out of control.
Preformed packing (4)
Seal (2)
Self-locking nut
Personnel Required
Three
References
TM 9-2350-238-24P-1
2-384