TM 9-2350-238-20-1
5
Install powerplant lifting sling to five lifting
eyes on powerplant (10).
Do not let powerplant hit hull or other
parts during installation to the vehicle.
6
Lower powerplant (10) into hull. Ensure
that engine mount hole aligns with hole
(11) in hull bottom, that transmission
engages alignment ring (12), and that
reservoir drain hose sticks out of access
hole (13) in hull bottom.
7
Remove powerplant lifting sling from lifting
eyes on powerplant (10).
2-403