TM 9-2350-238-34-2
2-28. MAINTENANCE OF BOOM AND WINCH–CONTROL CYLINDERS AND AT-
TACHING PARTS AND BOOM CONTROL CYLINDER ASSEMBLY (CONT).
INSTALLATION
(CONT)
2
3
4
5
Remove sling. Reset sling through cupola
opening and secure around boom winch
control cylinder assembly (1).
SLIN G
Install boom winch control cylinder
assembly (1) and secure to crane boom
(2) with upper boom cylinder headless
straight pin (3).
Install boom cylinder hinge pin locking
plate (4), two new Iockwashers (5), and
two hexagon head capscrews (6) securing
upper boom cylinder headless straight pin
(3) in boom winch control cylinder assem-
bly (1).
Lubricate with grease (item 9, appx B) and
install lubrication fitting (7) to upper boom
cylinder headless straight pin (3).
2-96