TM 9-2350-238-34-2
12 Install new control cylinder gasket (16)
and winch control cylinder (17) on con-
trol cylinder mounting adapter plate (14).
Make sure inlet port of winch control
cylinder is positioned as shown.
13 Install four new Iockwashers (18) and
four hexagon head capscrews (19). Tor-
que hexagon head capscrews to 18 ft-lb
(24 N-m).
14 Turn cable reel (1) and reaction end sup-
port (9) so that open end is upward.
15 Install new washer (20) on stage two
boom winch carrier assembly (21).
2-57