TM 9-2350-256-34
0072 00
11.
Install packing (hidden) (20) to suction line (18).
12.
Install suction line (18), two flanges (17), four lockwashers (16), and screws (15) to main hydraulic pump (19).
13.
Connect two hydraulic hoses (14) and install four flanges (13), eight lockwashers (12), and screws (11).
14.
Install packing (10).
15.
Install fittings (6), two flanges (9), four lockwashers (8), and screws (7).
16.
Connect hydraulic hose (5) to fittings (6) with two flanges (4), four lockwashers (3), and screws (2).
17.
Connect five hydraulic lines (1).
18.
Fill hydraulic oil tank in accordance with TM 9-2350-256-20.
END OF WORK PACKAGE
0072 00-13/14 blank