TM 9-2350-261-20-4
REPAIR M8 CHEMICAL ALARM JUNCTION BOX (M113A2 ONLY) — Continued
0774 00
ASSEMBLY
1.
Install receptacle (12), four screws (11), and new locknuts (10) on distribution box (6).
2.
Install circuit breaker (3) on distribution box (6). Secure with two screws (4) and new locknuts (5).
3.
Secure lead (2) to circuit breaker (3) with screw (1).
4.
Install terminal board (9), screw (7), and new locknut (8) in distribution box (6).
FOLLOW-THROUGH STEPS
1.
Install distribution box (WP 0773 00).
END OF TASK
0774 00-3/4 blank