TM-9-2350-261-20-4

CARRIER, M113A2, M577A2, M1064, M1068, M1059 AND M901A1

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL - VOLUME 4 OF 4

  TM-9-2350-261-20-4 - Page 625 of 767

TM 9-2350-261-20-4
FABRICATED TOOLS — Continued
0781 00
PARTS REQUIRED:
Item
Part Name
Part No.
CAGEC
NSN
Qty
1
Connector
539409-5
96214
5935-00-
098-9135
1
2
Shell
TBD
TBD
TBD
1
3
Pin (Male)
66506-9
00779
5999-01-
083-0891
12
4
Nut
TBD
TBD
TBD
2
5
Screw
TBD
TBD
TBD
2
6
Screw
TBD
TBD
TBD
2
7
Wire (22 AWG)
M22759/16-22-9
81349
6145-01-
042-4622
AR
8
Sealant
TBD
TBD
TBD
AR
NOTES:
1. Install minimum length (1 to 1-1/2 inches each) jumper wires (7) between pins (3), and insert pins into connector
(1) as follows:
2-3
6-21
11-24
15-16
19-23
20-22
2. Leave pins out of positions 1, 4, 5, 7, 8, 9, 10, 12, 13, 14, 17, 18, and 25.
CAUTION
The inverter under test may be damaged if plug connections are not exactly as specified or if wires are shorted to
the shell/other wires. Make sure wires are not pinched by the connector shell.
3. Position two captive screws (6) in the ears of shell (2). Install shell over connector (1) and secure with two screws (5)
and nuts (4).
4. Fill opening at the rear of shell (2) with sealant (8).
5. Purpose of plug is to fault isolate the inverters to determine which one has failed.
0781 00-2


Back to Top