TM 9-2350-261-34
REMOVE/INSTALL TRANSMISSION
0016 00
THIS WORK PACKAGE COVERS:
Removal (page 0016 00-1).
Installation (page 0016 00-9).
INITIAL SETUP:
Maintenance Level
Direct Support
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0104 00, Item 19)
Torque Wrench (WP 0104 00, Item 55)
Torque Wrench (WP 0104 00, Item 58)
Transmission Hoisting Adapter (WP 0104 00, Item 1)
Lifting Device 400 lb (182 kg) Capacity
Materials/Parts
Antiseize compound (WP 0105 00, Item 5)
Sealing compound (WP 0105 00, Item 17)
Sealing compound primer (WP 0105 00, Item 21)
Container, 1 quart (1 liter)
Key washer (5)
Locknut (2)
Locknut (8)
Locknut
Personnel Required
Track Vehicle Repairer 63H10
Helper (H)
References
See y our -
1
0
Equipment Condition
Power plant removed from carrier (see your -20)
Power plant blocked (WP 0015 00)
REMOVAL
NOTE
If you need to replace the engine, transmission, or transfer gearcase, drain the oil from each
BEFORE power plant is removed from carrier.
NOTE
Cap or cover openings where fuel, oil, or coolant lines or fittings have been removed.
001600-1