TM-9-2350-277-20-2

CARRIER M113A3, M577A3, M1059A3, M1064A3, M1068A3 AND M58

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL VOLUME 2 OF 6

  TM-9-2350-277-20-2 - Page 62 of 783

TM 9-2350-277-20-2
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS), INCLUDING
LUBRICATION INSTRUCTIONS — Continued
0155 00
ITEM
NO.
INTERVAL
MAN-
HOUR
ITEM TO BE
CHECKED OR
SERVICED
CREWMEMBER
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE
IF:
8
Semi-
Annual
Track Shoe End
Connectors/Bolts.
(T150 Track Only)
a.
Check all end connectors/bolts for cracks
and looseness. Check bolts for stripped
threads. TIGHTEN BOLTS TO 400-430
LB-FT (543-583 N·M) TORQUE. Use
torque wrench (WP 0926 00, Item 79).
Any
connectors that
are cracked,
broken, bent,
stripped, or
missing.
b.
New installed T150 track shoe end
connector bolts require a check between
30-80 miles of operation. RETORQUE
END CONNECTOR BOLTS TO 400-430
LB-FT (543-583 N·M). Use torque wrench
(WP 0926 00, Item 79).
0155 00-42
Change 5


Back to Top