INSTALL PERSONNEL HEATER KIT (M113A3, M1059A3, AND M58 ONLY) — Continued
0072 00
7.
Install grommet (10) in power plant bulkhead.
8.
Install exhaust pipe (11) in grommet (10).
9.
Install exhaust pipe (12) on exhaust pipe (11).
10. Secure two exhaust pipes (12) and (13) and two gaskets (14) to power plant bulkhead with four screws (15) and retained
locknuts (16).
0072 00-4
Change 3
TM 9-2350-277-34