TM 9-2350-311-10
2-12 PREPARATION FOR FIRING — CONTINUED
2-12.5
Loading the 155MM Cannon — Continued
c. Hand Ramming
1
Cannoneers no. 2 and 3 assemble four rammer staff cleaning sections (24) with artillery loading rammer
(25) on the end.
2
The assistant gunner elevates cannon tube to approximately 265 mils or convenient elevation to permit
hand ramming through hull rear door.
3
Cannoneer no, 1 places tray (13) in position.
4
Cannoneer no. 1 places projectile (26) on tray (13) and pushes the projectile forward by hand until the
rotating band (1) is just forward of tray.
2-213