TM-9-2350-311-20-1

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL FOR HULL, POWERPLANT, DRIVE CONTROLS, TRACKS, SUSPENSION, AND ASSOCIATED COMPONENTS

AUGUST 1994

  TM-9-2350-311-20-1 - Page 358 of 1275

TM 9-2350-311-20-1
3-3 TROUBLESHOOTING CHART —
CONTINUED
v.
B.O. MARKERS AND B.O. DRIVE LIGHTS
CIRCUIT — CONTINUED
(1) FRONT B.O. MARKER LIGHTS FAIL TO
OPERATE; ALL OTHER LIGHTS OPERATE
Tools
General mechanic’s tool kit (item 64, Appx H)
Driver’s instrument panel released (para 8-17)
Multimeters (item 36, Appx H)
TA-1 Probe kit (item 43, Appx H)
A
1. Disconnect bulkhead-to-driver’s instrument
2.
3.
4.
panel wiring harness from main light switch.
Place a jumper wire from socket F (lead
15) to socket E (lead 20/24).
Turn MASTER switch ON, place main light
switch to B.O. MARKER position, and check
front B.O. marker lights for operation.
Turn MASTER and main light switches OFF.
Do front B.O. marker lights operate?
Replace light switch (para 8-17).
B
1.
Reconnect bulkhead-to-drive's instrument
panel wiring harness to light switch.
2. Remove inoperative B.O. marker assembly
(para 8-22).
3. Place red lead of multimeters in center contact
of socket and black lead to ground.
4. Turn MASTER switch ON, place main light
switch to B.O. MARKER position, and check
for voltage.
5. Turn MASTER and light switches OFF.
Is voltage present?
Replace B.O. marker assembly (para 8-22).
CONTINUED ON NEXT PAGE
3-258


Back to Top