TM-9-2350-311-20-1

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL FOR HULL, POWERPLANT, DRIVE CONTROLS, TRACKS, SUSPENSION, AND ASSOCIATED COMPONENTS

AUGUST 1994

  TM-9-2350-311-20-1 - Page 365 of 1275

TM 9-2350-311-20-1
CONTINUED FROM STEP C
1. Install headlight assembly (para 8-23).
2. Disconnect lead 19 of bulkhead-to-
headlights/bilge pump wiring harness from
headlight resilient mount wiring harness.
3. Place red lead of multimeters in lead 19 and
black lead to ground.
4. Turn MASTER switch ON, place main light
switch to B.O. DRIVE position, and check for
voltage.
5. Turn MASTER and main light switches OFF.
Is voltage present?
Replace headlight resilient mount
I
wiring harness (para 8-24).
I
E
1. Reconnect lead 19 of bulkhead-to-
2.
3.
4.
5.
6.
headlights/bilge pump wiring harness to
headlight resilient mount wiring harness.
Disconnect bulkhead-to-driver’s instrument
panel wiring harness from driver’s bulkhead.
Place a jumper wire from pin H to socket H
(lead 459).
Place red lead of multimeters in socket F (lead
19) and black lead to ground.
Turn MASTER switch ON, place main light
switch to B.O. DRIVE position, and check for
voltage.
Turn MASTER and main light switches OFF.
Is voltage present?
bulkhead-to-headlights/bilge pump
Repair or replace lead 20/24 of
bulkhead-to-driver’s instrument panel
wiring harness (para 8-50).
END OF TASK
3-265
wiring harness (para 8-47).


Back to Top