TM 9–2350–311–20–2
3–51
Replace selector valve as-
sembly (para 6–16). If mal-
function persists, replace
failed gunner’s control as-
sembly (para 6–19 or
6–20).
yes
no
Replace solenoid (para
6–16).
CONTINUED FROM STEP D
E
CONTINUED FROM STEP A
CONTINUED ON NEXT PAGE
WIRE 623
ELEVATION
CONTROL
SWITCH
GUNNER’S
SELECTOR
SWITCH BOX
ASSEMBLY
–
+
1.
Turn MASTER and CAB POWER switches to
OFF.
2.
Reconnect wire 623 to selector valve assembly
solenoid.
3.
Place ELEVATION CONTROL switch in NO. 1
MAN position.
4.
Disconnect wire 623 from quick disconnect at
gunner’s selector switch box assembly.
5.
Place ELEVATION CONTROL switch in
GUNNER position.
6.
Turn MASTER and CAB POWER switches to
ON.
7.
Place red multimeter lead in wire 623 leading to
gunner’s selector switch box assembly and
black lead to ground.
8.
Check for voltage.
Is battery voltage present?
Repair or replace wire 623
(para 8–8).
yes
no