TM 9–2350–311–20–2
Change 2
3–55
yes
no
D
Check nitrogen precharge in secondary accumulator
(para 19–6).
Is pressure below normal?
Charge secondary accumu-
lator (para 19–6). Perform
leak test (para 6–12).
Notify support maintenance.
END OF TASK
CONTINUED FROM STEP C
EQUILIBRATED ELEVATING CYLINDER
SECONDARY ACCUMULATOR
PRIMARY
ACCUMULATOR