TM 9–2350–311–20–2
15–17
15–8 SIGNAL FLARE BRACKET ASSEMBLY
This task covers:
a.
Removal
b.
Installation
INITIAL SETUP
Tools
Artillery and turret mechanic’s tool kit
(SC 5180–95–CL–A12)
Materials/Parts
Lockwashers (4) (item 55, Appx G)
a.
Removal
NOTE
Remove flares from signal flare bracket assembly before beginning this procedure.
Remove four cap screws (1) and four lockwashers (2) from four mounting brackets (3) holding signal flare
bracket assembly (4) to cab. Discard lockwashers.
b.
Installation
Install four new lockwashers (2) and four cap screws (1) through four mounting brackets (3) to hold signal
flare bracket assembly (4) to cab.
1
2
3
4