TM-9-2350-311-34-1

HULL, POWERPLANT, DRIVE CONTROLS, TRACKS, SUSPENSION, AND ASSOCIATED COMPONENTS: HOWITZER, MEDIUM, SELF-PROPELLED, 155MM

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL

SEPTEMBER 1994

  TM-9-2350-311-34-1 - Page 20 of 352

TM 9-2350-311-34-1
1-3 DESTRUCTION OF ARMY MATERIEL TO PREVENT ENEMY USE — CONTINUED
A second method is to close the breechblock, elevate the tube, and toss several thermite grenades down the tube.
Elevate the tube so that the grenades will fall against the breechblock. This will melt the breech and the powder chamber,
causing them to fuse together.
1-4 PREPARATION FOR STORAGE AND SHIPMENT
Basic requirements for administrative storage are covered in TM 9-2350-311-20-2.
1-5 QUALITY ASSURANCE (QA)
Not applicable.
1-6 OFFICIAL NOMENCLATURE, NAMES, AND DESIGNATIONS
Nomenclature in this manual was chosen in accordance with the terms used for provisioning as they appear in the
Repair Parts and Special Tools List (RPSTL) and Maintenance Allocation Chart (MAC). A few tools and hull
components are, however, referred to by names more common than those in the RPSTL. In many cases the more
common name is a shorter name for the same component.
OFFICIAL PROVISIONING NOMENCLATURE
MORE COMMON
Ammunition rack
Ammo rack
Wiring harness
Dipstick
NAME
Intercommunications power harness
Intercom wiring harness
Intercommunications system
Intercom system
155mm, medium, self-propelled howitzer
Howitzer
Safety wire or nonelectrical wire
Lockwire
1-7 REPORTING EQUIPMENT IMPROVEMENT RECOMMENDATIONS (EIRs)
If your howitzer needs improvement, let us know. Send us an EIR. You, the user, are the only one who can tell us what
you don’t like about your equipment. Let us know why you don’t like the design or performance. Put it on an SF 368,
Product Quality Deficiency Report. Mail it to the address specified in DA PAM 738-750.
NOTE
When equipment failure occurs, but is not caused by normal wear, poor operation, or
accidental damage, an EIR must be submitted.
1-6


Back to Top