TM 9-2350-358-BD
10-19. TRACK DAMAGE, SHORT TRACKING - CONTINUED
Personnel/Time Required:
•
2 soldiers
•
2.0-3.0 hours
References:
TM 9-2350-314-20-1-2
Procedural Steps:
1.
Remove damaged suspension components.
2.
Remove a sufficient number of track blocks so that the track may be reconnected over the remaining roadwheels
and drive sprocket.
3.
Record the BDAR action taken.
When mission is complete, as soon as practical, repair the equipment/system
using standard maintenance procedures.
10-20