TM-9-2350-358-BD

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A6

TECHNICAL MANUAL; OPERATOR’S, UNIT, AND DIRECT SUPPORT SUPPORT MAINTENANCE

MARCH 1994

  TM-9-2350-358-BD - Page 227 of 343

TM 9-2350-358-BD
11-10. HYDRAULIC TUBE AND HOSE REPAIR (LOW-PRESSURE) - CONTINUED
Other Options:
Reference Instructions in M2/3 generic BDR kit.
Reference Chapter 3.
Procedural Steps:
1.
Wrap each end of hose to be cut with tape.
Squarely cut each end of damaged hose.
Clean loose particles from
ends of hose.
WARNING
Adhesives, solvents, and sealing compounds can burn easily, can give off harmful vapors, and are
harmful to skin and clothing.
To avoid injury or death, keep away from open fire and use it in well-
ventilated area.
If adhesive, solvent, or sealing compound gets on skin or clothing, wash
Immediately with soap and water.
2.
Spread a light coat of sealing compound on threads of adapter or tube.
3.
Install adapter or tube into each end of hose.
4.
Secure the hose on each end of adapter with two hose clamps.
Position clamp screws 180 degrees to each other.
5.
Record the BDAR action taken.
When mission is complete, as soon as practical, repair the equipment/system
using standard maintenance procedures.
Option 5:
Low pressure line repair (different size line ends) (center section).
Limitations:
None
Personnel/Time Required:
1 soldier
0.5-1.0 hour
11-9


Back to Top