TM-9-2520-234-35

POWER TRAIN ASSEMBLY; ALLISON MODEL XTG411-2A

TECHNICAL MANUAL; FIELD AND DEPOT MAINTENANCE MANUAL

JULY 1962

  TM-9-2520-234-35 - Page 31 of 323

Figure 4. Model XTG 411-2a,XTG 411-4 power trains
*C1
*C1
*C1
*C1
*C1
PAR 1-3
GENERAL
CHAP 1, SEC I
e .
Appendices and Index. Following
Chapter 6 are Appendix A and Appendix B
and the book index. Appendix A contains
a list of current references, including sup-
ply manuals, forms, technical manuals and
other available publications applicable to
the XTG 411 power trains. Appendix B
tabulates the expendable supplies and
materials needed for the repair tasks in
this manual.
f . Fold-out Illustrations. The 15 fold-
out pages and 15 supplement pages at the
end of the book include a schematic view
of the hydraulic system (fig. 372 an d
372.1) and 14 exploded views of the power
train components (figs. 373 through 386.1).
These pages may be folded out so that the
entire view extends beyond the right edge
of other pages in the book, making the
view completely visible while readin g
paragraphs concerning it.
g.
Reporting
Equipment Improve-
ment Recommendations (EIR). EIRs will
be prepared using a SF 368 (Quality Defi-
ciency Report). Instructions for preparing
EIRs are provided in DA PAM 738-750
(Army Maintenance Management System).
EIRs should be mailed directly to: Com-
mander, U.S .
Arm y
Tank-Automotive
Command, ATTN: AMSTA-QRT, Warren,
MI 48397-5000. A reply will be furnished
to you.
h . Lubrication. Refer to the vehicle
operator manual and lubrication order for
instructions.
i.
Maintenance
Instructions.
Refe r
to the Vehicle
Organizational or Direct
Support/General
Support
Maintenance
Manual.
FIELD AND DEPOT MAINTENANCE
ALLOCATION
Refer to the maintenance allocation
chart in the Vehicle Organizational Main-
tenance Manual.
3. FORMS, RECORDS AND REPORTS
Department of the Army forms and
procedures used for equipment mainte-
nance will be those prescribed by DA
PAM 738-750 (Army Maintenance Man-
agement System) (TAMMS).
Change 2
3


Back to Top