TM 9-2815-210-34-2-2
FRAME 6
1.
Hook up a source of clean dry air to pneumatic tank valve (1).
2.
Pressurize container (2) to 5 psi.
After container (2) stands for 12 hours,
check that air pressure is still 5 psi.
3.
If air pressure is below 5 psi, remove engine from shipping container (part 1,
para 2-3), and repair container.
Refer to TM 9-2320-209-34 to repair
container.
END OF TASK
6-7 8