TM-9-2815-220-24

AVDS-1790 2CA, 2DA and 2DR Air-Cooled 12-Cylinder Diesel Engines

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL FOR AVDS-1790 2CA, 2DA and 2DR Air-Cooled 12-Cylinder Diesel Engines

  TM-9-2815-220-24 - Page 1017 of 1563

TM 9-2815-220-24
FUEL INJECTION PUMP LINKAGE REPLACE/REPAIR
0124 00
CLEANING
1. See Work Package 0028 for General Cleaning Procedures.
INSPECTION
All parts must be inspected with care.
Replace parts if damage or wear exceeds allowable
limits.
1. See Work Package 0028 00 for General Inspection Procedures.
2. Measure inside diameter (A) of rotating eye bracket (26), using inside micrometer (item 16,
WP 0175).
Replace rotating eye bracket if not within limits in the following table.
3. Measure outside diameter (B) of straight shaft (28), using outside micrometer (item 17, WP
01756).
Replace straight shaft if not within limits in the following table.
Location
Sizes and Fits of New Parts inches (mm)
Wear Limits
A
(inside diameter)
1.3740 (34.9996)
1.3746 (34.918)
1.3748 (34.9299)
B
(outside diameter)
0.6249 (15.8724)
0.6252 (15.8860)
0.6248 (15.8699)
28
A
A
B
26
NOTE
Inspection and repair of throttle/governor control rod assembly
(adjustable) (21) and throttle/governor control rod (rigid) are covered
in separate work packages (WP 0125 and 0126 respectively).
WP 0124 00-5


Back to Top