TM 9-2815-225-34&P
0006 00
0006 00-9
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) INSTRUCTIONS (Contd)
(1)
GROUP
NO.
(2)
COMPONENT/
ASSEMBLY
(3)
MAINTENANCE
FUNCTION
(4)
MAINTENANCE
CATEGORY
(5)
TOOLS AND
EQUIPMENT
F
H
0105
Valves
Chamshaft and
Bearing
Cam Follower
Housing
Cam Follower
Push Tubes
(Valve)
Timing Gear
Rocker Arm
Assembly
Valve Cover and
Gasket
Inspect
Adjust
Replace
Inspect
Adjust
Replace
Inspect
Replace
Inspect
Replace
Inspect
Replace
Inspect
Replace
Inspect
Replace
Inspect
Replace
0.8
1.8
14.0
0.6
2.5
27.0
0.2
12.0
0.2
14.0
0.1
8.0
0.6
24.0
71 thru 77
2
197 thru 206
46 thru 49
51 thru 54, 81
Table 2. Maintenance Allocation Chart for M915–M920 (Contd).