PS Magazine - JUNE 1977

PS, The Preventative Maintenance Monthly

ISSUE 295

JUNE 1977

PS Magazine - JUNE 1977 - Page 22 of 35
f
(i1
±
CHAPARRaL
r
PART
-
±
)?
The HeadligHt,
NSN
6220-00±984±
fiE ±
²
³§´
µ
5180,
will bE GEttinG back into thE launcH station caN
scratcHED oR
systEm quick-likE. It'll BE arounD for a cloudEd by thE WRong clEanER± THat's
GooD wHilE²
Why substitutes aRE oUt (youR pal
If you'RE ³n a cruncH and nEEd a ins³dE must sEe oUt, iF HE´s GoinG to bE
suBstitutE soonest, you can GEt a eFfEctivE)µ
hEadliGht With
NSN
6620-²0±7³6-
THE clEaninG pRocEduRE is in TM
9-
4712.
¶iRst, tHouGh, tRy agaiN foR
6220-
1440-585-10
µ
µ
² aND the O·LY
00-984´5180µ
It holDs up lonGeRµ
authorizED
clEaneR
1s
PlExiGlas
The heaDL³GHt´s l³stED in T¸
9-
polisH³nG kit
NSN
¶560-00-624-0175·
1450-585´20P¸
That, too, ³s caLlED out iN the
-10
T¸µ
BEEn ru¹¹inGº
»otH cautions
are
important ²²² oFF
BE¼rE startinG, and kEEp tHE sWitcH
oFF until thE M½¾ sEttlEs doWn (a
minutE or so)²
¿tÀErWisE, youÁll damaGE and losE
your communications From tHE M½¾
poWEr surGE²
THE sWitcHEs arE on thE mastEr
contro panEl oF tHE launcH statioò


Back to Top
Back to Top