PS Magazine - JUNE 1981

PS, The Preventative Maintenance Monthly

ISSUE 343

JUNE 1981

PS Magazine - JUNE 1981 - Page 7 of 35
FOR YoU CrEWMel, TH± 3
/²V³´S Aµ¶ stIL· iN f¸c¹º
»v¼n ½¾ ¿Ày DÁÂ'Ã haPpÄÅ Æ
BÇ ÈÉ Ê˶ -10 Ì ÍÎ ÏÐuÑ
ÒÓÔÕÖ×ØÙÚÛ ÜÝÞKß .à
i\
PeriscopE
·
Stud
Re±laCemenT
You organizational mechs can now
repLace stUd, NS± 5307-00²924²³666,
in the M36 or M36E´ periscopes of
M60A´ and M60A3 tanks.
The stud, WhiCh joins the rod and
the cLamp, often gets damaged and
needs repLacementµ This neWs Will be
in F¶ture changes to the -20 and ·20P
manuals for the M60²series tanks but
It pRoBaBLy Wouldn't get broken i¸
the first pLace if tank creWme¹ aLWays
remembered to stoW the linkage that
includes the stUd on the hanger When
they remove the machine gunµ
ºemind them aBout that and yoU
mechanics can save yours»lf some
work and ¼ncle Sa½ some moneyµ
áâ
¾rom noW on you¿ll haVe a little more leeway when you adjUst the track
tension on any M60²series tank With T1À2 replaceable pad track.
All the -Á0 TMÂs noW Ãall for a measUrement betWeen
7/16
and
ã
inchµ
Ähanges to the Å10 TMÆs WiLL have the new tolerance, but yoU can start
using it right aWay.
If you happen to have the old, T97E2 fixed block track on yoUr tank, the
clearance on it remains
ä
to
5/±6
inch (6.3 to 7µ9-MM).
áá


Back to Top
Back to Top