PS Magazine - NOVEMBER 1984

PS, The Preventative Maintenance Monthly

ISSUE 384

NOVEMBER 1984

PS Magazine - NOVEMBER 1984 - Page 20 of 33
'
i
:
I
:
!
'
Ii
!
j
I
I
1.
I'
±
UH-60A .±²
Birds-the feathered kind±continue to set up housekeeping in the UH²60A 's
tail rotor gearbox cowling.
The bird (Army³´pe) headshed has now coIe up with a sure²fire fix to keep
those cowlings cLear. Here's what you'll need to make the handhoLd cover.
Rivet the strap and pLastic sheet unµ
der the cowling opening¶ The FexibLe
pLastic will push in when a mech grabs
the handholD, then snap back into pLace
over thE hole¶
Check with the Local sheet me·L shop
for 7075³T 6 aLuminum be¸re order¹
ing a 3²ft x 6³ft sheet.
*The plastic sheet's NSN isn't on
the ADF yet, so use a DD Form
1348³´
to order. The RC is S9G and
the cost is
$1µ´3µ
40
±
²
³
0
´
µ
·
¸
Rivet
_
sheeT
insIde
¶ole·
NOV 8±
u¸¹60a
.
:
Hydraulic Lines Shou±d StaND Ta²²
ºivets »n the floor of
¼he Black
H½wk's m¾in rotor pylon can wear thru
hy¿raÀl»c
l»nes
if
the
Lines
aren't
r½»sed h»gÁ enoÀgÁÂ
à hy¿r½Àl»c l»ne thÄt leaks in flÅght
m½kes all Kin¿s oÆ liGhts fLash on the
instrument PanelÇsign½l»ng an in³flight
emÈrgency.
ÉheÊK thOse linesË ÌÆ ½ny rivets are
toO clOse Ír ÊoMÍrtÎ l»Æt the Lines out
oÆ troÀÏle w»th lOngeÐ sleÈve sÑacersË
·
gets
½
half³»nÊÁ
long
alÀmiNÀm
sP½cer
tÁ½t's
gOod Ír ÒOÓ 8 or Òo 10
M½ch»ne sÊrewsË
Ôor a
1/2Õin sp½Êer Ír a 1/4³in
ÏOltÎ Àse ÒSÒ 53Ö5³00²
82ÖÕ×192.
@²L
l³´µn
º» L
¼
½
I±²·³´50 µ¶
Øse ÒSÒ Ö24Ù³0ÚÕ79ÛÕ258Ü to geÝ ½ New ÏulÏ Ír the P»lot's Penl»gÁtÞ
sßle àasÁl»ghtÎ ÒSÒ Ö2áÙ²ÙÙ³âã1Õá3Ö2äå ÒSæ Ö1á5ÕÙÙÕÖ4ç 13Ù9 Gets èepl½ceé
êent ÃÃ
ë
ϽttÈr»es Ír tÁÈ l»GÁìsÂ
¸OV
²4
³1
¶·
¹


Back to Top
Back to Top