PS Magazine - TB 43-PS-487

PS, The Preventative Maintenance Monthly

ISSUE 487

JUNE 1993

PS Magazine - TB 43-PS-487 - Page 41 of 43
'
OISE .±²
r
±²
lN'T SWE! L±²
R³VUCe YO 1v
cAPA´Xty anµ G¶ ou·
.
¸F ¹º» s¼½¾ iH¿À ÁÂÃÄÅ
hÆÇf IÈ MÉ ÊË Ìm£ ÍÎÏÐ
\
hen you operate the distrIbuTion illumInaTIon system, eLectr±cal (O²SE) ±n the
summer³ you'lL need to decrease the electrIcaL Load because h±gh TemperaTures Tr±p
The tHermal-magneTic cIrcuIT breakers.
·
CIrcuIT breaKers heaT up when They caRry currenT´ When The aIr Temperature is
highµ The breaKer heaTs up more¶ ·hen ±t Trips at a Lower amperage than IT¸s rated f¹rº
Power»O¼SE equipmeNT has hydrau½ic-magneT±c cIrcu¾T brea¿ersÀ whIch are less
sensitIve To h±gh temperatures¶
When you use The D²SE To power equIpmenT thaT must hAve an un±nterrupTed
power supplY³ The load caÁacÂTy oF The cIrcuÂT breaker should be reduced
and³ ià necessaÄyÅ The Load shouLd be red±sTribuTedÆ
·he load can be redIsTrIbuTed by movIng Loads to dIÇÃerenT circu±T breakersÅ addIng
another DÈSE box or usIng a D²SE box w±Th a higher ampere ratIng¶ ÉM
9-6Ñ50Ò
22ÓÒÔ3
and ÊË
2ÕÖ×Ô
have The InÌrmat±on on Load baLancingÍ
ÎememberÏ no maTTer whaT The TemperaTure³ never Ðoad The cIrcu±t breaKers To
The±r FuLL capac±Ty because oÑ load ýucTuaTIons during sTarT±ng and stoppingº
·Äy to avoId exposing the D²SE To dIrect sunl±ghTÒ ÓuT D²SE boXes ±n The shade
or maKe shade ùr The boXesÍ Be sure The D²SE boxes are welL veNTILatedÔ
HØrÙ ÚÛÜ ÝÞ ÚpÛßxàáâ"ã äå\æ
çèéêëKì íî ïðñòðó ôõök÷øù
wúûü ýþÿ Ā āĂă Ąą ĆćĈĉ ĊċČč
Ď7
ďĐđď7
4ĐĒĐď
ē8
ďĔ
ď4ĕďĖ
Ď8đēĎ
4Ďđ48
7ďė8ď
ďĐĎđď7ē
ď4ēĘďĖ4
ďĎĚ
ďĎđď4
ĎĐđĎę
ēĖđ4Ď
ěđ7ē
ďĎęĜď48
ĝ
Ğ
_!,
{u/³
/,
';
±
±,
²
-
³´
ğ
Ġ
. ±
ġ
JĢģĤĥĦ


Back to Top
Back to Top