Between The bladders, sToRe the sledge hammeR and collapsed telescopic alu-
miNUm paddLe.
±exT ²o the TaNks, sTack The pLastic cheMica³ pails´
On the same sIde of The µOWP¶ as the pails· the two sto¸age boxes should be
fasteNed wiTh a strap unde¸ the taNKs¹ ºf The boxes a¸eN't st»apped dowN, they can
shifT and damage the µOW¼¶ during t¸avel½
¾he¸e aRe oN³y two stoRage boxes, bUt They aRe labe³ed STo¸age Box
2
and
SToRage Box
3.
¾hey hoLd chemica³s· too³s a¿d installation items. Appendix B of
¾À
10-46±0²2³9´µ0
has the load plans fÁ¸ The two boxes½
¾he boTtom layeR oF sto¸age space is whe¸e the two raw wateR pumps and
baCKwash pump are sTowed. Âover The pumps wiTh caNvas and strap them dowN½
On The back of the µOW¼¶· next To the generator· strap The dist¸ibution pump
dowN wÃTh The poÄTable stepÅ
StoRe the ¸aw wate¸ ÆloaT
Ç
iN The cenTeR of the µOW¼¶ nexT to the two ±BÂ
cyLindersÈ
STow The rolledÉup discharge hoses on The ¸ight side´ ºf they're just Tossed In·
the hoses wiÊL breaK breaThers· connecTo¸s and sighË glasses· too½