SMI-9-2320-387-14P-1

TRUCK, UTILITY: EXPANDED CAPACITY

SUPPLEMENTAL OPERATION, MAINTENANCE, AND REPAIR PARTS INSTRUCTIONS

JULY 2004

  SMI-9-2320-387-14P-1 - Page 146 of 671

11-29.1. CARGO SHELL DOOR GAS SPRING MOUNTING BRACKET REPLACEMENT
This task covers:
a. Removal
b. Installation
a. Removal
1.
Remove two locknuts (9), washers (1), capscrews (2), and washers (1) from bracket (3) and
wheelhouse (6). Discard locknuts (9).
2.
Remove two locknuts (8), washers (4), backing plate (7), capscrews (5), washers (4), and bracket (3)
from wheelhouse (6). Discard locknuts (8). Remove tape from bracket (3) and discard tape.
INITIAL SETUP:
Applicable Models
M1151
Tools
General mechanic’s tool kit:
automotive (Appendix B, Item 1)
Materials/Parts
Tape (Appendix C, Item 78)
Four locknuts (Appendix G, Item 77)
Personnel Required
One mechanic
One assistant
Manual References
TM 9-2320-387-10
TM 9-2320-387-24P
Equiment Condition
• Tailgate lowered (TM 9-2320-387-10).
• Gas spring removed (para. 11-22).
b. Installation
1.
Apply tape to bracket (3) mounting surfaces. Install bracket (3) on wheelhouse (6) with two
washers (4), capscrews (5), backing plate (7), washers (4), and locknuts (8). Tighten locknuts (8) to
8 lb-ft (11 N
m).
2.
Secure bracket (3) to wheelhouse (6) with two washers (1), capscrews (2), washers (1), and
locknuts (9). Tighten locknuts (9) to 8 lb-ft (11 N
m).
SMI 9-2320-387-14&P-1
11-52.2
Change 4
FOLLOW-ON TASKS: • Install gas spring (para. 11-22).
• Raise and secure tailgate (TM 9-2320-387-10).


Back to Top