TB-9-2320-279-13-P-2

TECHNICAL BULLETIN; CREW PROTECTION KIT

OPERATOR’S, UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LISTS (RPSTL)

SEPTEMBER 2005

  TB-9-2320-279-13-P-2 - Page 334 of 460

II106700-5
Rev. B
Page 70
d.
Re-install the Tire Carrier and Spare Tire.
1.
Position the Tire Carrier (see Item 1 in Figure 42) on the fender (2).
2.
Install two screws (3), two lockwashers (4), and two nuts (5).
3.
Install two screws (6), two lockwashers (7), and two nuts (8) on the tire carrier (1)
and the fender (2) as shown.
4.
Torque the screws (3) to 80 ft-lb.


Back to Top