TB-9-2320-279-13-P-3

TECHNICAL BULLETIN; TANKER ARMOR MODULE KIT

OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST AND INSTALLATION INSTRUCTIONS)

JANUARY 2007

  TB-9-2320-279-13-P-3 - Page 104 of 396

TB 9-2320-279-13&P-3
0021-4
0021
END OF TASK
FOLLOW-ON MAINTENANCE
1. Install wheel well assemblies (WP 0026).
2. Install 2500 gallon tank (TM 9-2320-279-34).
3. Install top panel assembly (WP 0025).
4. Connect batteries (TM 9-2320-279-20).
5. Remove wheel chocks (TM 9-2320-279-10).
END OF TASK
END OF WORK PACKAGE


Back to Top