TB-9-2320-279-13-P-3

TECHNICAL BULLETIN; TANKER ARMOR MODULE KIT

OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST AND INSTALLATION INSTRUCTIONS)

JANUARY 2007

  TB-9-2320-279-13-P-3 - Page 99 of 396

TB 9-2320-279-13&P-3
0020-3
0020
ASSEMBLY
NOTE
NOTE
Both right side access door and left side access door assembly are assembled the same
way. Right side access door shown.
1. Install two grab/pull handles (8) to side access panel assembly (3) with four lockwashers (7) and
screws (6).
END OF TASK


Back to Top