TB-9-2320-279-13-P-3

TECHNICAL BULLETIN; TANKER ARMOR MODULE KIT

OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST AND INSTALLATION INSTRUCTIONS)

JANUARY 2007

  TB-9-2320-279-13-P-3 - Page 94 of 396

TB 9-2320-279-13&P-3
0019-4
0019
ASSEMBLY
1. Install round bumper (14) to right upper side panel assembly (4).
2. Install tapping channel assembly (13) on right upper side panel assembly (4) with five washers (12),
lockwashers (11), and screws (10).
3. Tighten screws (10) to 60 lb-ft. (81 N•m).
END OF TASK


Back to Top