TB-9-2320-279-13-P-3

TECHNICAL BULLETIN; TANKER ARMOR MODULE KIT

OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST AND INSTALLATION INSTRUCTIONS)

JANUARY 2007

  TB-9-2320-279-13-P-3 - Page 88 of 396

TB 9-2320-279-13&P-3
0018-4
0018
ASSEMBLY
1. Install tapping channel assembly (13) on left upper side panel assembly (4) with five washers (12),
lockwashers (11), and screws (10).
2. Tighten screws (10) to 60 lb-ft. (81 N•m).
END OF TASK


Back to Top