TB 9-2320-279-13&P-3
0017-5/(6 blank)
0017
INSTALLATION - CONTINUED
4. Install lower side panel assembly (4) to front panel assembly (21) with two locknuts (20), washers (19),
lockwashers (18), and screws (17). Do not tighten locknuts at this time.
5. Install lower panel assembly (4) on rear panel assembly (16) with two washers (15), lockwashers (14),
and screws (13). Do not tighten screws at this time.
6. Install two washers (12), lockwashers (11), and screws (10) on lower panel assembly (4). Do not tighten
screws at this time.
7. Route wiring harness through tanker light grommet (8) and install tanker light grommet in lower side panel
assembly (4).
8. Install washer (7), lockwasher (6), and screw (5) in lower side panel assembly (4). Do not tighten screws
at this time.
9. Install washer (3), lockwasher (2), and screw (1) in lower side panel assembly (4). Do not tighten screws
at this time.
10. Tighten locknuts (20) to 60 lb-ft. (81 N•m).
11. Tighten screw (1) and two screws (10) to 37 lb-ft. (50 N•m).
12. Tighten screw (5) and two screws (13) to 60 lb-ft. (81 N•m).
END OF TASK
FOLLOW-ON MAINTENANCE
1. Install reflector and side marker light (WP 0028).
2. Install right upper side panel assembly (for right lower side panel assembly) (WP 0020).
3. Install left upper side panel assembly (for left lower side panel assembly) (WP 0019).
4. Connect batteries (TM 9-2320-279-20).
5. Remove wheel chocks (TM 9-2320-279-10).
END OF TASK
END OF WORK PACKAGE