TB-9-2320-279-13-P-3

TECHNICAL BULLETIN; TANKER ARMOR MODULE KIT

OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST AND INSTALLATION INSTRUCTIONS)

JANUARY 2007

  TB-9-2320-279-13-P-3 - Page 339 of 396

TB 9-2320-279-13&P
0040
0040-89
REMOVE VICTALIC
CONNECTION BETWEEN
TANK AND MODULE.
REFERENCE PRIMARY
PUMP PIPING


Back to Top