TB-9-2320-279-13-P-3

TECHNICAL BULLETIN; TANKER ARMOR MODULE KIT

OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST AND INSTALLATION INSTRUCTIONS)

JANUARY 2007

  TB-9-2320-279-13-P-3 - Page 347 of 396

TB 9-2320-279-13&P
0040
0040-97
Install four spacers (14), washers (15), screws (16), washers (17), and locknuts (18) in rear tank
mounting bracket (9) and frame mounting bracket (4). Do not tighten locknuts.
Compress springs on both left and right front tank mounts 3-5/8 in. ± 1/8 in. (92 mm ± 3 mm).
Tighten three locknuts (13) on front tank mounting brackets (2).
Tighten four locknuts (18) on rear frame mounting brackets (4). Torque to 150 lb-ft (203 N•m).
Soldier A holds eight screws (5) while Soldier B tightens nuts (6) behind rear frame mounting bracket (4).


Back to Top