TB-9-2320-279-13-P-3

TECHNICAL BULLETIN; TANKER ARMOR MODULE KIT

OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST AND INSTALLATION INSTRUCTIONS)

JANUARY 2007

  TB-9-2320-279-13-P-3 - Page 352 of 396

TB 9-2320-279-13&P
0040
0040-102
Align pipes (17 and 18) and install coupling gasket (19) over connections of pipes.
Install two coupling halves (20) on coupling gasket (19) with two screws (21) and nuts (22).
Align pipes (23 and 24) and install coupling gasket (25) over connections of pipes.
Install two coupling halves (26) on coupling gasket (25) with two screws (27) and nuts (28).


Back to Top