TB-9-2320-279-13-P-3

TECHNICAL BULLETIN; TANKER ARMOR MODULE KIT

OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST AND INSTALLATION INSTRUCTIONS)

JANUARY 2007

  TB-9-2320-279-13-P-3 - Page 356 of 396

TB 9-2320-279-13&P
0040
0040-106
EMERGENCY SHUT-OFF CABLE INSTALLATION
Install fitting (13) and nut (14) in frame (15).
Do not tighten fitting.
Install cable (7) through nut (14) and fitting (13).
Tighten nut (14).
Connect cable (7) to trip bar (16) with U-bolt (17), clamp (18), and two nuts (19).
Adjust cable


Back to Top