TB-9-2320-279-13-P-3

TECHNICAL BULLETIN; TANKER ARMOR MODULE KIT

OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST AND INSTALLATION INSTRUCTIONS)

JANUARY 2007

  TB-9-2320-279-13-P-3 - Page 357 of 396

TB 9-2320-279-13&P
0040
0040-107
V1 EMERGENCY VALVE CABLE INSTALLATION
Install cable (1) in bracket (8) and tighten two nuts (9).
Install cable (1) in offset link (10) with nut (11).


Back to Top