TB-9-2320-279-13-P-3

TECHNICAL BULLETIN; TANKER ARMOR MODULE KIT

OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST AND INSTALLATION INSTRUCTIONS)

JANUARY 2007

  TB-9-2320-279-13-P-3 - Page 342 of 396

TB 9-2320-279-13&P
0040
0040-92
Screws are inside tank mounting rail.
Soldier A removes two screws (12) from left side of tank front crossmember (13) while Soldier B holds
and removes locknuts (14).
Soldier A removes three screws (15) from right side of tank front crossmember (13) while Soldier B
holds and removes locknuts (16).
Soldier A and Soldier B remove tank front crossmember (13) from vehicle.


Back to Top