TB-9-2320-280-35-12

TECHNICAL BULLETIN

INSTALLATION INSTRUCTIONS FOR EPLRS NETWORK MANAGER VEHICLE WITH AMTECH TOP

OCTOBER 2006
CHANGE 1

  TB-9-2320-280-35-12 - Page 103 of 162

TB 9-2320-280-35-12
5-75
Figure 5-107.
Figure 5-108.
Figure 5-109.
Section XXXVI. MASTER KILL SWITCH CABLE INSTALLATION
36-1.
Route master kill switch cables (1) and (4), from master kill switch (2) down computer stand (3) to
tunnel (7).
36-2.
Route master kill switch cable (4) to rear battery box.
36-3.
Route master kill switch cable (1) through grommeted hole (5) in cab enclosure panel (6) to vehicle
battery (10).
36-4.
Secure master kill switch cable (1) to vehicle battery positive terminal (9) with existing nut (8).
3
7
4
5
1
2
4
~
~
6
~
1
10
8
9
~
1
~
~


Back to Top