TB 9-2320-280-35-12
5-84
Section XL. AC DISTRIBUTION BOX CABLE INSTALLATION
40-1.
Route AC distribution box cable (2) to AC output selection box (13).
40-2.
Secure AC distribution box cable (2) to wheelhouse (3) with five clamps (9), screws (8), washers (10),
lockwashers (11), and nuts (12).
40-3.
Secure prosine inverter output cable (7) to AC distribution box cable (2) with three tie straps (6).
40-4.
Connect KOK-13 power cable (4) and printer power cable (5) to AC distribution box (1).
2
4
5
6
7
8
9
10
11
12
13
3
2
1
~
~
~
2. AC DISTRIBUTUION BOX CABLE – P/O A3265676 – QTY. 1
4. KOK-13 POWER CABLE – A3265651 – QTY. 1
5. PRINTER AC POWER CABLE – A3265673 – QTY. 1
6. TIE STRAP – MS3367-1-0 – QTY. 3
7. PROSINE INVENTER OUTPUT CABLE – A3265674 – QTY. 1
8. SCREW – MS90725-8 – QTY. 5
9. LOOP CLAMP – 3225T46 – QTY. 5
10. WASHER – MS27183-10 – QTY. 5
11. LOCKWASHER – MS35338-44 – QTY. 5
12. NUT – MS51967-2 – QTY. 5
Figure 5-119.