TB 9-2320-280-35-12
5-82
Section XXXIX. DC CHARGER CABLE INSTALLATION
39-1.
Route DC charger cables (4) along wheelhouse (7) top, from DC charger (6), to battery box.
39-2.
Secure DC charger cables (4) to wheelhouse (7) top, with three clamps (3), three screws (1), six
washers (2), three lockwashers (9), three nuts (8) and three tie straps (5).
39-3.
Secure DC charger cables (4) to wheelhouse (7) front, with two clamps (3), screws (1), washers (2),
lockwashers (9), nuts (8), and tie straps (5).
5
6
1
2
3
4
2
9
8
~
7
~
1. SCREW – MS90725-8 – QTY. 3
2. WASHER – MS27183-10 – QTY. 6
3. LOOP CLAMP – 3225T48 – QTY. 3
4. DC CHARGER CABLE – P/O 93-WP40-A – QTY. 1
5. TIE STRAP – MS3367-1-0 – QTY. A/R
8. NUT – MS51967-2 – QTY. 3
9. LOCKWASHER – MS35338-44 – QTY. 3
Figure 5-117.


Back to Top