TB-9-2320-280-35-12

TECHNICAL BULLETIN

INSTALLATION INSTRUCTIONS FOR EPLRS NETWORK MANAGER VEHICLE WITH AMTECH TOP

OCTOBER 2006
CHANGE 1

  TB-9-2320-280-35-12 - Page 70 of 162

TB 9-2320-280-35-12
5-42
Section XXV.
EXTERNAL POWER RECEPTION BOX INSTALLATION
25-1.
Locate, mark, and drill one 0.147-in. diameter hole (1) in right rear wheelhouse (2).
25-2.
Using external power reception box (4) as template, locate, mark, and drill four 0.343-in. diameter
holes (3) in right rear wheelhouse (2).
1
2
~
11.25 TO REAR OF FENDER
2.25
2
3
~
17.00 TO REAR OF FENDER
4.25
Figure 5-60.
Figure 5-61.


Back to Top