TB-9-2320-280-35-14

TECHNICAL BULLETIN

INSTALLATION INSTRUCTIONS FOR SINGLE CHANNEL GROUND AND AIRBORNE RADIO SYSTEM (SINCGARS) AN/VRC-88F, AN/VRC-89F, AN/VRC-90F, AN/VRC-91F, AN/VRC-92F

SEPTEMBER 2006

  TB-9-2320-280-35-14 - Page 34 of 148

5-12
TB 9-2320-280-35-14
Section VII. INTEGRATED RACK INSTALLATION
NOTE
Perform step 7-1 only if MT-6353/VRC mounting base is to be
installed.
7-1.
Remove two inserts (2) from bottom of integrated rack (1).
7-2.
Using integrated rack (1) as template, locate, mark, and drill one 0.390-in. diameter hole (4) in
dash (6).
7-3.
Remove paint from vicinity of hole (4) and two existing inserts (5).
7-4.
Install insert (3) in hole (4).
7-5.
Apply anti-seize compound to vicinity of inserts (3) and (5) as required.
Figure 5-16.
2
1
Figure 5-17.
5
3
4
3. INSERT – 12446871-2 – QTY. 1
1. RACK, INTEGRATED – A3276903 – QTY. 1
~
6