TB-9-2320-280-35-15

TECHNICAL BULLETIN

INSTALLATION INSTRUCTIONS FOR RETRANSMISSION VEHICLE WITH AMTECH TOP FOR AN/VRC-92F, AN/UYK-128 (V)4, RT-1812, AN/VSQ-2 (V), AB-1386/U, DAGR, AN/PSN-11

SEPTEMBER 2006

  TB-9-2320-280-35-15 - Page 62 of 168

TB 9-2320-280-35-15
5-38
Figure 5-47.
1. POWER AMP MOUNTING BASE, MT6353/VRC – A3014053-1 – QTY. 1
2. NUT STRIP – A3014064-1 – QTY. 1
3. LOCKWASHER – MS45904-72 – QTY. 6
4. CAPSCREW – B1821BH031F125N – QTY. 2
6. NUT – 9418892– QTY. 2
8. CAPSCREW – B1821BH031F075N – QTY. 2
Section XXI. POWER AMPLIFIER INSTALLATION ON UPPER SHELF OF MULTI-NET RACK
21-1.
Using power amp mounting base MT6353/VRC (1) as template, locate, mark, and drill four
0.343-in. holes (5) in upper shelf of multi-net rack (7).
21-2.
Install power amp mounting base MT6353/VRC (1) on upper shelf of multi-net rack (7) with nut
strip (2), two capscrews (4), and lockwashers (3).
21-3.
Secure power amp mounting base MT6353/VRC (1) on upper shelf of multi-net rack (7) with two
capscrews (8), four lockwashers (3), and two nuts (6).
1
2
3
3
3
6
8
7
4
5
~


Back to Top