TB-9-2320-302-13-P-2

CREW PROTECTION KIT PART 2 OF 3

TECHNICAL BULLETIN; OPERATOR'S, UNIT AND DIRECT SUPPORT, MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS AND REPAIR PARTS AND SPECIAL TOOLS LIST

JUNE 2007

  TB-9-2320-302-13-P-2 - Page 79 of 396

TB 9-2320-302-13&P-2
DOOR HANDLE REPLACEMENT - CONTINUED
0013 00
0013 00-3/(0013 00-4 Blank)
CLEANING AND INSPECTION
Clean and inspect all parts IAW
General Maintenance Instructions
(WP 0011 00).
INSTALLATION
1.
Install internal door handle (9) and two new cotter pins (8) on door assembly (7).
2.
Install internal mounting plate (10), external mounting plate (5), and two bolts on door assembly (7). Center plate hole
on internal bolt hole before tightening bolts.
3.
Install external door handle (4), three new lockwashers (2), washers (3), and bolts (1) on external mounting plate (5).
4.
Check alignment of door latch (WP 0015 00).
END OF WORK PACKAGE


Back to Top