TB-9-2320-302-13-P-2

CREW PROTECTION KIT PART 2 OF 3

TECHNICAL BULLETIN; OPERATOR'S, UNIT AND DIRECT SUPPORT, MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS AND REPAIR PARTS AND SPECIAL TOOLS LIST

JUNE 2007

  TB-9-2320-302-13-P-2 - Page 90 of 396

TB 9-2320-302-13&P-2
UNDERBODY MINE BLAST PANEL REPLACEMENT - CONTINUED
0017 00
0017 00-2
REMOVAL
1.
Remove two locknuts (3) and washers (2) from rear cab mounts (1). Discard locknuts.
440-091
2
3
2
1
1
2
3


Back to Top