TB-9-2320-302-13-P-2

CREW PROTECTION KIT PART 2 OF 3

TECHNICAL BULLETIN; OPERATOR'S, UNIT AND DIRECT SUPPORT, MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS AND REPAIR PARTS AND SPECIAL TOOLS LIST

JUNE 2007

  TB-9-2320-302-13-P-2 - Page 97 of 396

TB 9-2320-302-13&P-2
UNDERBODY MINE BLAST PANEL REPLACEMENT - CONTINUED
0017 00
0017 00-9
REMOVAL - CONTINUED
NOTE
Assistance is required to remove mine blast mounting brackets from underneath cab as mounting hardware
is removed.
14.
With assistance, remove six bolts (32), washers (33), lockwashers (34), and three left-hand mine blast mounting brack-
ets (35) under cab assembly (4). Discard lockwashers.
CLEANING AND INSPECTION
Clean and inspect all parts IAW
General Maintenance Instructions
(WP 0011 00).
440-021
4
32,33,34
35


Back to Top